ON THE GROUND CONSTRUCTION
OVERSIGHT FOR OWNERS AND
DEVELOPERS WHO CAN'T BE.

BUILT ON EXPERIENCE

An owner's rep who isn't on site is missing things. That's the job. Most come up through vertical — buildings, interiors, finishes. My background is civil land development — earthwork, underground utilities, roads, concrete, and infrastructure — which is where the real money is made or lost on a subdivision or site development project.

With experience on both sides of the table, as a civil contractor and as the developer's representative, I understand exactly how projects get delayed, where budgets leak, and how to prevent both. I've managed 1,100+ lots across simultaneous projects and have the municipal relationships, subcontractor knowledge, and field instincts to know when a change order is legitimate — and when it isn't.

On vertical projects — multifamily, hospitality, office — the risk profile shifts to MEP coordination, schedule integration, and finishes. I've worked that side of the table too, managing the concrete package on a $300M+ luxury resort in Park City.

I focus on projects where the budget gets won or lost in the ground — where most owner's reps are weakest.

THE NUMBERS, NOT THE MARKETING

1,100+
LOTS MANAGED
$500M+
PROJECT VALUE
10+
YEARS IN CONSTRUCTION
11
PROJECTS

SELECTED PROJECTS

The shape of the work.

Aerial drone view of Summerfield North residential subdivision under construction, Keenesburg Colorado

SUMMERFIELD NORTH

CIVIL - LAND DEVELOPMENT

Keenesburg, CO

198 Single Family Home Lots
The Pendry luxury resort under construction, nine-story building with crane, Park City Utah

THE PENDRY

VERTICAL - LUXURY RESORT

Park City, UT

152 Resort Units + Retail
Aerial drone view of Vista West subdivision roads and lot development, 120 single family home lots, Keenesburg Colorado

VISTA WEST

CIVIL - LAND DEVELOPMENT

Keenesberg, CO

120 Residential Lots
Waterline and box culvert installation at FRICO Ditch Speer Canal Crossing, Brighton Colorado

BRIGHTON CROSSINGS - FRICO DITCH BOX CULVERT

CIVIL - DRAINAGE INFRASTRUCTURE

Brighton, CO

Box Culvert in Active Ditch
Parkdale Filing 3 residential subdivision construction, 162 single family home lots, Erie Colorado

PARKDALE FILING 3

CIVIL

Erie, CO

162 Residential Lots

Not a generalist. Not a GC. Not a remote consultant. Senior-level owner's rep on the ground, civil-first, week-in week-out. I know how the trades think. I catch the change orders. You close the deals.

BOTH SIDES OF THE TABLE

Experience as a civil contractor and as the developer's representative means I understand how subcontractors think, where margin is hidden, and how to protect your budget before problems compound. That's why I'm the wrong person to bluff — and the right person to have on your side when someone tries it.

STRAIGHT TALK

If the schedule's slipping, you'll know that week — not when the GC finally admits it. If a change order doesn't pencil, I'll tell you before you pay it. No spin, no soft-pedaling, no consultant-speak. My job is to protect your budget, not your feelings.

NO HANDOFFS

You don't get a junior PM. You don't get a rotating cast. You get me — on every site visit, every weekly report, every call. Most owner's rep firms put a senior name on the contract and a junior on the job. I don't. Fractional doesn't mean part-time. It means the senior person is the only person.
You get a senior-level owner's rep without the cost of a full-time hire. Weekly reporting, change order oversight, site documentation, and full availability — structured around your project's actual needs.

COMMON QUESTIONS

Everything you'd want to know before the first call.

What is a fractional owner's representative? +

A fractional owner's representative provides the same on-site oversight and project management as a full-time owner's rep, but structured as a monthly retainer rather than a salaried hire. You get senior-level oversight — site visits, contractor management, change order review, budget tracking — without the cost of a full-time employee. For most developers running one or two active projects at a time, fractional is the more cost-effective model.

What does an owner's rep actually do on a construction project? +

An owner's rep sits on your side of the table — not the contractor's. On civil and land development projects, that means attending OAC meetings, reviewing and challenging pay applications, catching schedule slippage before it compounds, negotiating change orders, coordinating with municipalities and engineers, and giving you a weekly read on where the project actually stands. The job is to protect your budget and your timeline, and to be the person on site who knows when something's wrong before the GC tells you about it.

How is an owner's rep different from a general contractor? +

A GC builds the project. An owner's rep watches the GC build it — on your behalf. The GC's job is to complete the work within their contract. Your rep's job is to make sure that contract is being honored, that change orders are legitimate, that the schedule reflects reality, and that your interests are protected when they conflict with the contractor's. Most developers without a rep find out about problems when they're expensive. Most developers with one find out when they're manageable.

What types of projects does CattleDog work on? +

The core focus is horizontal civil work — subdivisions, site development, underground utilities, roads, earthwork, and infrastructure. That's where most owner's reps are weakest and where budget risk is highest. CattleDog also works on vertical projects with significant civil scope: build-to-rent, multifamily, industrial, self-storage, and senior living. If you're running a primarily vertical project — a podium tower, hotel renovation, or Class A office TI — there are better-fit reps for that work, and you'll hear that on the first call.

How much does an owner's representative cost in Colorado? +

CattleDog engagements run $4,000–$15,000 per month depending on project phase and required involvement. Pre-construction and entitlement work typically falls in the $4,000–$6,000 range. Active civil construction runs $7,000–$10,000. Peak construction with full trade coordination runs $10,000–$15,000. Day-rate and percentage-of-construction-cost structures are also available for spot oversight and full-service engagements. Every engagement starts with a scoping conversation — the first call is free and there's no obligation.

Do I need an owner's rep if I already have a project manager on staff? +

It depends on what your PM's background is. Most in-house project managers come up through vertical construction — interiors, finishes, MEP coordination. Civil work operates differently. The risk profile, the subcontractor dynamics, the pay application structure, and the change order patterns on a subdivision or site development project are different from what most vertical PMs manage daily. If your PM hasn't run civil work from the contractor side, a fractional civil-first rep can fill that gap without replacing anyone.

Where does CattleDog work? +

Front Range Colorado is home base — Denver, the metro, and the corridor north and south. That covers Jefferson, Douglas, Arapahoe, Adams, Weld, and Larimer counties without travel costs. Mountain West regional work — Utah, Wyoming, Montana, Arizona — is available with biweekly scheduled site visits, with travel billed at cost. National work is taken case by case. The one rule: CattleDog doesn't take engagements where showing up at the cadence the project needs isn't possible.

How do I know if my project is a good fit? +

The fastest way is a 20-minute call. CattleDog works best on projects where the budget gets won or lost before vertical work starts — subdivisions, BTR sites, industrial pads, site development. If your project is further along, already in distress, or primarily vertical, that conversation will tell you whether CattleDog is the right fit or whether a different kind of rep would serve you better. Either way, you leave the call with a clearer read on your project.

GET IN TOUCH

Got a project that's about to get complicated — or already is? Send me a note and I'd happy to walk through it whether we end up being a fit or not.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.